BIC Adolfo Martínez Hernández
Jump to navigation
Jump to search
PAI Emperador Carlos III in January 2020
| |
History | |
---|---|
Creeperopolis | |
Name: | PAI Emperador Carlos III |
Namesake: | Carlos III |
Ordered: | January 26, 2014 |
Cost: | $49.6 billion colóns |
Laid down: | September 6, 2018 |
History | |
Launched: | October 2021 (planned) |
Commissioned: | March 2022 (planned) |
Status: | Under construction |
General characteristics | |
Class and type: | Carlos III-Class Aircraft Carrier |
Displacement: | 102,000 long tons |
Length: | 1,092 feet |
Beam: | 252 ft |
Draft: | 37 feet |
Propulsion: |
|
Speed: | 30+ knots |
Complement: | 3,532 |
Sensors and processing systems: |
|
Electronic warfare & decoys: |
|
Armament: |
|
Armor: | 2.5 in |
Aircraft carried: | 90 Maroto Botín MB-23s and 4 Maroto Botín H-33s |
The PAI Emperador Carlos III is a planned Creeperian Naval aircraft carrier.
It is planned to be completed by March 2022.