Difference between revisions of "Electrical standards in Rakeo"
Jump to navigation
Jump to search
Line 72: | Line 72: | ||
| cdm = | | cdm = | ||
}} | }} | ||
− | |||
Portions of agriculture and heavy industry in Rakeo are directly operated at a central government level with similarly centralized standards- but domestic products and many electric grids do not adhere to one particular standard. There are six different national power grids primarily operated by [[Olino Water and Power]], [[Venen Power Systems]], [[South Electric]], and a variety of smaller operators. | Portions of agriculture and heavy industry in Rakeo are directly operated at a central government level with similarly centralized standards- but domestic products and many electric grids do not adhere to one particular standard. There are six different national power grids primarily operated by [[Olino Water and Power]], [[Venen Power Systems]], [[South Electric]], and a variety of smaller operators. |
Revision as of 00:59, 5 August 2022
Data | |
---|---|
Continuity of supply | Yes |
Share of fossil energy | 82% |
Share of renewable energy | 18% |
Portions of agriculture and heavy industry in Rakeo are directly operated at a central government level with similarly centralized standards- but domestic products and many electric grids do not adhere to one particular standard. There are six different national power grids primarily operated by Olino Water and Power, Venen Power Systems, South Electric, and a variety of smaller operators.
History
Infrastructure
Generation and transport
Sockets
Socket | Earthed / Grounded | Description | Photograph |
---|---|---|---|
Aviea 3-pin | Yes | 20A, 250V |