Difference between revisions of "Aktonia Metro"

From The League Wiki
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 7: Line 7:
 
| image2 = Metro-3A-15.jpg
 
| image2 = Metro-3A-15.jpg
 
| alt2 = A green line train
 
| alt2 = A green line train
| imagesize2 = 320px
+
| imagesize2 = 360px
 
| caption2 =   
 
| caption2 =   
 
| locale = [[Sconia]], [[Aktonia]]
 
| locale = [[Sconia]], [[Aktonia]]

Latest revision as of 16:46, 19 April 2024

Aktonia Metro
Cairo metro logo2012.svg
A green line train
Overview
Native nameمترو اكتونيا
LocaleSconia, Aktonia
Transit typeRapid transit
Number of lines4 (1.5 operational)
Number of stations49 (24 operational)
Daily ridership450 thousands (2022/23)
Annual ridership140 million (2022/23)
Websiteaktoniametro.org.sc
Operation
Began operation10 March 2022; 2 years ago (2022-03-10)
Operator(s)Aktonia Metro Corportation
Metro Lines Map
Sconia metro map - under construction.png

The Aktonia Metro is a rapid transit system serving Aktonia, The metro was started on in 2015, with Yingtai International being the funder for the metro, it became operational on the 10th of March, 2022, it became a popular mode of transport due to its cheap tickets and general high quality of the metro, the trains are made in Kivu by Schröder AG, with plans to open a factory in Sconia in the near future, trains come in different designs for each line, the trains are third rail.

History

Proposal and construction

Train designs