Difference between revisions of "Aktonia Metro"
Jump to navigation
Jump to search
Line 4: | Line 4: | ||
| image = [[File:Cairo_metro_logo2012.svg|center|230px]] | | image = [[File:Cairo_metro_logo2012.svg|center|230px]] | ||
| alt = Aktonia Metro Logo | | alt = Aktonia Metro Logo | ||
− | | imagesize = | + | | imagesize = 250px |
| image2 = Metro-3A-15.jpg | | image2 = Metro-3A-15.jpg | ||
| alt2 = A green line train | | alt2 = A green line train |
Revision as of 16:45, 19 April 2024
Aktonia Metro | |||
---|---|---|---|
Overview | |||
Native name | مترو اكتونيا | ||
Locale | Sconia, Aktonia | ||
Transit type | Rapid transit | ||
Number of lines | 4 (1.5 operational) | ||
Number of stations | 49 (24 operational) | ||
Daily ridership | 450 thousands (2022/23) | ||
Annual ridership | 140 million (2022/23) | ||
Website | aktoniametro.org.sc | ||
Operation | |||
Began operation | 10 March 2022 | ||
Operator(s) | Aktonia Metro Corportation | ||
|
The Aktonia Metro is a rapid transit system serving Aktonia, The metro was started on in 2015, with Yingtai International being the funder for the metro, it became operational on the 10th of March, 2022, it became a popular mode of transport due to its cheap tickets and general high quality of the metro, the trains are made in Kivu by Schröder AG, with plans to open a factory in Sconia in the near future, trains come in different designs for each line, the trains are third rail.