Difference between revisions of "Aktonia Metro"

From The League Wiki
Jump to navigation Jump to search
Line 5: Line 5:
 
| alt = Aktonia Metro Logo
 
| alt = Aktonia Metro Logo
 
| imagesize = 150px
 
| imagesize = 150px
| image2 =  
+
| image2 = Metro-3A-15.jpg
| alt2 =  
+
| alt2 = A green line train
 
| imagesize2 = 320px
 
| imagesize2 = 320px
 
| caption2 =   
 
| caption2 =   
Line 24: Line 24:
 
| map_state = show
 
| map_state = show
 
}}
 
}}
The '''Aktonia Metro''' is a rapid transit system serving Aktonia, The metro was started on in 2015, with [[Yingtai International]] being the funder for the metro, it became operational on  
+
The '''Aktonia Metro''' is a rapid transit system serving Aktonia, The metro was started on in 2015, with [[Yingtai International]] being the funder for the metro, it became operational on the 10th of March, 2022, it became a popular mode of transport due to its cheap tickets and general quality of it, the trains are supplied
 
==History==
 
==History==
 
===Proposal and construction===
 
===Proposal and construction===

Revision as of 15:38, 29 October 2023

Aktonia Metro
Cairo metro logo2012.svg
A green line train
Overview
Native nameمترو اكتونيا
LocaleSconia, Aktonia
Transit typeRapid transit
Number of lines4 (1.5 operational)
Number of stations49 (24 operational)
Daily ridership450 thousands (2022/23)
Annual ridership140 million (2022/23)
Websiteaktoniametro.org.sc
Operation
Began operation10 March 2022; 2 years ago (2022-03-10)
Operator(s)Aktonia Metro Corportation
Metro Lines Map
Sconia metro map - under construction.png

The Aktonia Metro is a rapid transit system serving Aktonia, The metro was started on in 2015, with Yingtai International being the funder for the metro, it became operational on the 10th of March, 2022, it became a popular mode of transport due to its cheap tickets and general quality of it, the trains are supplied

History

Proposal and construction