Difference between revisions of "Aktonia Metro"

From The League Wiki
Jump to navigation Jump to search
 
(24 intermediate revisions by the same user not shown)
Line 5: Line 5:
 
| alt = Aktonia Metro Logo
 
| alt = Aktonia Metro Logo
 
| imagesize = 150px
 
| imagesize = 150px
| image2 =  
+
| image2 = Metro-3A-15.jpg
| alt2 =  
+
| alt2 = A green line train
| imagesize2 = 320px
+
| imagesize2 = 360px
 
| caption2 =   
 
| caption2 =   
 
| locale = [[Sconia]], [[Aktonia]]
 
| locale = [[Sconia]], [[Aktonia]]
 
| transit_type = Rapid transit
 
| transit_type = Rapid transit
| lines = 3 (1 operational)
+
| lines = 4 (1.5 operational)
| stations = 25 (12 operational)
+
| stations = 49 (24 operational)
 
| daily_ridership = 450 thousands (2022/23)
 
| daily_ridership = 450 thousands (2022/23)
 
| annual_ridership = 140 million (2022/23)
 
| annual_ridership = 140 million (2022/23)
 
| website = aktoniametro.org.sc
 
| website = aktoniametro.org.sc
| operator = Aktonia Metro Company
+
| operator = Aktonia Metro Corportation
 
| began_operation = {{Start date and age|2022|03|10|df=yes}}
 
| began_operation = {{Start date and age|2022|03|10|df=yes}}
 
| system_length =  
 
| system_length =  
 
| track_gauge =
 
| track_gauge =
| map = [[File:AMetro.png|350px|thumb|left|Expected Metro Lines Map in 2031]]
+
| map = [[File:Sconia_metro_map_-_under_construction.png|350px||center|]]
 
| map_name = Metro Lines Map
 
| map_name = Metro Lines Map
 
| map_state = show
 
| map_state = show
 
}}
 
}}
 +
The '''Aktonia Metro''' is a rapid transit system serving [[Aktonia]], The metro was started on in 2015, with [[Yingtai International]] being the funder for the metro, it became operational on the 10th of March, 2022, it became a popular mode of transport due to its cheap tickets and general high quality of the metro, the trains are made in Kivu by [[Schröder AG]], with plans to open a factory in Sconia in the near future, trains come in different designs for each line, the trains are third rail.
 +
==History==
  
==History==
 
 
===Proposal and construction===
 
===Proposal and construction===
 +
 +
==Train designs==
 +
{{Gallery
 +
| title        = Train designs
 +
| align        = Left
 +
| footer      =
 +
| style        =
 +
| state        =
 +
| height      =
 +
| width        = 175
 +
| captionstyle =
 +
| File: Metro-3A-15.jpg
 +
| Green Line
 +
| File: Line2.jpg
 +
| Orange Line
 +
| File: red train.jpg
 +
| Red Line
 +
| File: blue metro.jpg
 +
| Blue Line
 +
}}
 +
[[Category:Sconia]]
 +
[[Category:Sconian companies]]
 +
[[Category:Company]]
 +
[[Category:Terraconserva]]

Latest revision as of 16:46, 19 April 2024

Aktonia Metro
Cairo metro logo2012.svg
A green line train
Overview
Native nameمترو اكتونيا
LocaleSconia, Aktonia
Transit typeRapid transit
Number of lines4 (1.5 operational)
Number of stations49 (24 operational)
Daily ridership450 thousands (2022/23)
Annual ridership140 million (2022/23)
Websiteaktoniametro.org.sc
Operation
Began operation10 March 2022; 2 years ago (2022-03-10)
Operator(s)Aktonia Metro Corportation
Metro Lines Map
Sconia metro map - under construction.png

The Aktonia Metro is a rapid transit system serving Aktonia, The metro was started on in 2015, with Yingtai International being the funder for the metro, it became operational on the 10th of March, 2022, it became a popular mode of transport due to its cheap tickets and general high quality of the metro, the trains are made in Kivu by Schröder AG, with plans to open a factory in Sconia in the near future, trains come in different designs for each line, the trains are third rail.

History

Proposal and construction

Train designs