Difference between revisions of "Aktonia Metro"
Jump to navigation
Jump to search
(24 intermediate revisions by the same user not shown) | |||
Line 5: | Line 5: | ||
| alt = Aktonia Metro Logo | | alt = Aktonia Metro Logo | ||
| imagesize = 150px | | imagesize = 150px | ||
− | | image2 = | + | | image2 = Metro-3A-15.jpg |
− | | alt2 = | + | | alt2 = A green line train |
− | | imagesize2 = | + | | imagesize2 = 360px |
| caption2 = | | caption2 = | ||
| locale = [[Sconia]], [[Aktonia]] | | locale = [[Sconia]], [[Aktonia]] | ||
| transit_type = Rapid transit | | transit_type = Rapid transit | ||
− | | lines = | + | | lines = 4 (1.5 operational) |
− | | stations = | + | | stations = 49 (24 operational) |
| daily_ridership = 450 thousands (2022/23) | | daily_ridership = 450 thousands (2022/23) | ||
| annual_ridership = 140 million (2022/23) | | annual_ridership = 140 million (2022/23) | ||
| website = aktoniametro.org.sc | | website = aktoniametro.org.sc | ||
− | | operator = Aktonia Metro | + | | operator = Aktonia Metro Corportation |
| began_operation = {{Start date and age|2022|03|10|df=yes}} | | began_operation = {{Start date and age|2022|03|10|df=yes}} | ||
| system_length = | | system_length = | ||
| track_gauge = | | track_gauge = | ||
− | | map = [[File: | + | | map = [[File:Sconia_metro_map_-_under_construction.png|350px||center|]] |
| map_name = Metro Lines Map | | map_name = Metro Lines Map | ||
| map_state = show | | map_state = show | ||
}} | }} | ||
+ | The '''Aktonia Metro''' is a rapid transit system serving [[Aktonia]], The metro was started on in 2015, with [[Yingtai International]] being the funder for the metro, it became operational on the 10th of March, 2022, it became a popular mode of transport due to its cheap tickets and general high quality of the metro, the trains are made in Kivu by [[Schröder AG]], with plans to open a factory in Sconia in the near future, trains come in different designs for each line, the trains are third rail. | ||
+ | ==History== | ||
− | |||
===Proposal and construction=== | ===Proposal and construction=== | ||
+ | |||
+ | ==Train designs== | ||
+ | {{Gallery | ||
+ | | title = Train designs | ||
+ | | align = Left | ||
+ | | footer = | ||
+ | | style = | ||
+ | | state = | ||
+ | | height = | ||
+ | | width = 175 | ||
+ | | captionstyle = | ||
+ | | File: Metro-3A-15.jpg | ||
+ | | Green Line | ||
+ | | File: Line2.jpg | ||
+ | | Orange Line | ||
+ | | File: red train.jpg | ||
+ | | Red Line | ||
+ | | File: blue metro.jpg | ||
+ | | Blue Line | ||
+ | }} | ||
+ | [[Category:Sconia]] | ||
+ | [[Category:Sconian companies]] | ||
+ | [[Category:Company]] | ||
+ | [[Category:Terraconserva]] |
Latest revision as of 16:46, 19 April 2024
Aktonia Metro | |||
---|---|---|---|
Overview | |||
Native name | مترو اكتونيا | ||
Locale | Sconia, Aktonia | ||
Transit type | Rapid transit | ||
Number of lines | 4 (1.5 operational) | ||
Number of stations | 49 (24 operational) | ||
Daily ridership | 450 thousands (2022/23) | ||
Annual ridership | 140 million (2022/23) | ||
Website | aktoniametro.org.sc | ||
Operation | |||
Began operation | 10 March 2022 | ||
Operator(s) | Aktonia Metro Corportation | ||
|
The Aktonia Metro is a rapid transit system serving Aktonia, The metro was started on in 2015, with Yingtai International being the funder for the metro, it became operational on the 10th of March, 2022, it became a popular mode of transport due to its cheap tickets and general high quality of the metro, the trains are made in Kivu by Schröder AG, with plans to open a factory in Sconia in the near future, trains come in different designs for each line, the trains are third rail.