Difference between revisions of "Monsilvan Railways Administration"
Jump to navigation
Jump to search
m |
m |
||
Line 3: | Line 3: | ||
| name = Monsilvan Railways Administration | | name = Monsilvan Railways Administration | ||
| native_name = 山國鐵路 | | native_name = 山國鐵路 | ||
− | | image = MRA | + | | image = MRA logo.png |
| alt = | | alt = | ||
| imagesize = 100px | | imagesize = 100px |
Revision as of 12:18, 1 December 2022
Monsilvan Railways Administration | |||
---|---|---|---|
Overview | |||
Native name | 山國鐵路 | ||
Locale | Monsilva | ||
Transit type | Heavy rail | ||
Number of lines | 34 | ||
Number of stations | 145 (+200 under state-only administration) | ||
Annual ridership | 231,267,955 (2018) 0.66% | ||
Chief executive | Paub Buapo | ||
Website | railway.gov.ms | ||
Operation | |||
Began operation | 1938 | ||
Operator(s) | Monsilvan Railways Administration | ||
Character | Mixed | ||
Number of vehicles | 900 | ||
Technical | |||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) | ||
Top speed | 300 km/h (190 mph) | ||
|