Green Line

From The League Wiki
Jump to navigation Jump to search
Green Line
MapofGreenline.png
Overview
Other name(s)EX-MX069 Jackian Naming System
TypeMixed passenger and cargo train line
SystemInternational
StatusOperational
TerminiJackson Greenville, Jackson
Eleutherios Marathon, Eleutherios
Stations4
Services2
Daily ridership~360,000
Websitegreenline.info
Operation
Completed21 September 2015 (2015-09-21)
OwnerJackson, Eleutherios, and Terranihil
Operator(s)LSMetro
Technical
Line length6,800 km (4,200 mi)
Number of tracks2
ElectrificationMagnetically Launched Track
Operating speed350 mph (560 km/h)

The Green Line is a magnetically launched cargo and passenger train line that runs through Greenville, Pinaria, Mestaga, and Marathon. It was built to strengthen cultural and trade ties between Eleutherios and Jackson, along with providing Terranihil with more train infrastructure. It was built by LSMetro for a cost of $400 billion Jackian dollars, paid by all three governments.