Difference between revisions of "Electrical standards in Rakeo"

From The League Wiki
Jump to navigation Jump to search
(Adding infobox)
Line 1: Line 1:
 
{{Infobox electricity sector
 
{{Infobox electricity sector
| country              = [[Rakeo]]
+
| country              = Rakeo
| image                =  
+
| image                = File:Power-Pole-7926.jpg
| imagesize            =  
+
| imagesize            = 200px
| imagecaption          =  
+
| imagecaption          = Utility pole in [[Olino]], [[Rakeo]]
 
| coverage              =  
 
| coverage              =  
| continuity            =  
+
| continuity            = Yes
 
| capacity              =  
 
| capacity              =  
 
| capacityyear          =
 
| capacityyear          =
Line 14: Line 14:
 
| imports              =
 
| imports              =
 
| importsyear          =  
 
| importsyear          =  
| fossilshare          =  
+
| fossilshare          = 82%
| renewableshare        =  
+
| renewableshare        = 18%
 
| greenhouse            =  
 
| greenhouse            =  
 
| greenhouseyear        =  
 
| greenhouseyear        =  

Revision as of 00:58, 5 August 2022

Electricity sector of Rakeo
Power-Pole-7926.jpg
Utility pole in Olino, Rakeo
Data
Continuity of supplyYes
Share of fossil energy82%
Share of renewable energy18%


Portions of agriculture and heavy industry in Rakeo are directly operated at a central government level with similarly centralized standards- but domestic products and many electric grids do not adhere to one particular standard. There are six different national power grids primarily operated by Olino Water and Power, Venen Power Systems, South Electric, and a variety of smaller operators.

History

Infrastructure

Generation and transport

  Olino Water and Power
  Venen Power Systems
  South Electric
  Norte Regulatory Zone
  Oeste Regulatory Zone
  Este Regulatory Zone

Sockets

Socket Earthed / Grounded Description Photograph
Aviea 3-pin Yes 20A, 250V Tomada Brasileira - NBR 14136, 20A, 250V.jpg